Hopetoun Staff Accommodation | B.H.P.
2006 – 2008
A design and install project for an advanced air conditioning, electrical and communications system.  The job was finished on time and with 0 Lost Time Injuries (L.T.I.’s)

Mixed Unit Development | JCY Architects
2008
Thermelec were engaged to design and install highly efficient, state of the art air conditioning systems, with high specification equipment and workmanship.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s)

Ravensthorpe Community Centre | Shire of Ravensthorpe
2007
Thermelec were engaged to design and install a state of the art air conditioning system, with high specification equipment.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Shire Offices | Shire of Ravensthorpe
2007
A powerful system with multi-zoning, and a need for individual temperature control and calculation.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Hopetoun Police Station and Medical Centre | Hopetoun Shire
2007
The installation and supplied materials were fitted to meet the stringent Government compliance and specifications.  The ducted reverse cycle system had to be carefully balanced in four separate buildings, each with custom zoning for highly active rooms, and rooms which were only occasionally used.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Horizon Power Office | Horizon Power
2007
Designed and installed to high specifications of the Government, and the power authority.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Roebourne Prison | Department of Corrective Services
2005
Design and installation of a large APAC unit with custom integration of auxiliary relays and controls, multiple parallel stop start stations, and co-ordination with multiple existing evaporative units  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Roebourne jail. So many men and boys had to suffer here.

Northam Library | Shire of Northam
2004
Air conditioning fit out to meet Government specifications and design criteria.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

Hi-Smelt | AUSCO
2004
Air conditioning and electrical supply and installation in offices, operation rooms, switching rooms.  The job involved high safety compliance and irregular ventilation requirements, all of which were met.  The job was finished early and with 0 Lost Time Injuries (L.T.I.’s).

What makes our AIR CONDITIONING designs Different?
Thermelec use a computer aided design package to correctly calculate unit sizing using heat sources and losses, adjacent temperatures, occupation rate and so on.  This is the same program used by the Royal Australian Air Force.

AC1.jpg

AC2 Heat Loss.jpg

HOW DO WE DO OUR ELECTRICAL CALCULATIONS?
All our designs are rigorously tested and our services and designs include:

CABLE SIZING - (AWG & Kemils), voltage drops, fuse/CB sizes, Exact 'K', minimum trip currents, effective 'Z' and installed  Cable Temperatures, AC & DC impedances, compliance checking or for Engineering in spare capacity - copper & aluminium cables, AC & DC. Installations, variable frequency.

Cable Sizing.jpg

POWER FACTOR CORRECTION - capacitor sizes  (KVAR's), released system capacity , installation costs, annual savings & payback times.

http://www.solutionselectrical.com.au/images/Power%20Factor2.jpg

TRANSFORMER REGULATION AND SIZING
http://www.solutionselectrical.com.au/images/Transformer%20Regulation.jpg

ELECTRICAL ESTIMATING AND DESIGN
Circuit Design.jpg

SHORT CIRCUIT DESIGN - MVA, kA, X/R ration and power factor for HV and LV installations.

COORDINATION AND DISCRIMINATION STUDIES -Full coordination and discrimination studies, curves, pick-up and instantaneous settings. All Curves to ANSI and IEC Standard log display.